Microsoft uses Containers (called ITPACs) to build out its data centers. These Containers are Shipping Containers fitted with all the necessary climate controlnetworkingserver racks and other hardware necessary to be a “mini” data center all in one.
Azure Regions
An Azure region is a set of data centers deployed within a latency-defined perimeter and connected through a dedicated regional low-latency network.
With more global regions than any other cloud providerAzure gives customers the flexibility to deploy applications where they need to. Azure is generally available in 46 regions around the worldwith plans announced for 8 additional regions.
Geographies
An Azure geography is a discrete markettypically containing two or more regionsthat preserves data residency and compliance boundaries.
Geographies allow customers with specific data-residency and compliance needs to keep their data and applications close. Geographies are fault-tolerant to withstand complete region failure through their connection to our dedicated high-capacity networking infrastructure.
Availability Zones
Availability Zones are physically separate locations within an Azure region. Each Availability Zone is made up of one or more data centers equipped with independent powercoolingand networking.