版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、HYPERLINK N:整理后hp:ww.cN:整理后hp:ww.c更多企业学院:中小企业治理全能版83套讲座+9700份资料总经理、高层治理49套讲座+1638份资料中层治理学院46套讲座+62份资料国学智慧、易经46套讲座人力资源学院5套讲座+2713份资料各时期职员培训学院77套讲座+32份资料职员治理企业学院67套讲座+ 872份资料工厂生产治理学院52套讲座 3920份资料财务治理学院53套讲座+ 194份资料销售经理学院6套讲座+ 430份资料销售人员培训学院72套讲座+ 489份资料M omese foll :-TheDLP prodfo hscontrctis sae as 1
2、ar wilee wranty priod is tate s 3yes.Plase cha the P perodto 2 yeas (or standadfor this project if s ot years)ad 0 years warranty fotefire door. Se ttachd for page wherehe DLPerio stted as 10 eas.回标疑问卷15 To rmve thepriced B fm tese 2 setof dcumns if th BQ has ben supesdedy he contrc BQ.nract Q s e d
3、esign for he ain enrnce oor type 乙(S2.1/) the sme s the Pbl Aea imber fir or ty M乙 (S21/1/G)? If itshesame thing, ples rejust he ratest tie withch othr.Is hQ give omlete? The ot os shonundrthe Conract BQ(RB97,19300) oes not tie up wit teawrded sum(RMB1,210,48.79).专用条件Te item in tcontents pagdoes no
4、match with te tual lue. S47 i kno s 竣工报备n h ontents page but i electeda 竣工报表 in the actalclaeCause S0.1, subclaus4 on pag C/38. Reference is maeto claue 4.6 ofthe 投标须知in pragrph 1. The 投标须知 is no part of this cotract,so pleas check to ensure th clau tieupif n, hange acringy.Itm S2.1lause 4.3() c
5、tualClaue261 mentioe i ti cascn bounItem S0.1 Claus4. acual Cause6.12. mentined in thislausecantb foundAppcateifyou coul lear the atachedconrct.Iwill g throug atmy end in parallePls find theattached or your clearane psI ad sendto Amy befe sh goes on lea, but have ot reverted to us.Lupls ol it un
6、l o clerace from leg. Sorry for incovenience caedWith egardsto Qno. 2,or uggestion is o gofr camage colo ower coatnstd o matc the rest th developmet.item 3.7.1,te duratin of biting the maerial i too log.Thewhol otrac eriois o mnt+. Peas educe to reaoae im frme Thy aresubmtng erframne odight? annofnd
7、 in the LA Thnks.Wiregs n No. ,ursgestonis tog forchame color pdr ctintd matc the est of the devlopetForte qualiicatio o te tndrerainco l todvse tat eyidethe qualificaion ofthe frma he ar wigwih ndu ourswhicI thikis o gien the tit imeline (caoln is tisok wth u ? pls advse)rdeign/dwings sny ls oo
8、w up sa.Fr ontract rovisins anmei l olo upaaBcopy o ths mil, apria my, Mcel and Carline c hepreview n paralel nd revertit men,f ay, in pallPea undersndig that weare calng sevral ontracts in paralel in rder tomeet the tih timele and yassitane i the above r appecited.With rgads to Q No. 2orsuggeiois
9、 too r chape coo poer co instead to mtch e estof the devlomntPlea eply to queso nme 2 asa matteuency s S cn eply to tetndrs.lsinclude oreli assessmetan povide he preim asssment on Moday rningPlas ry to the fllig urgety.Te edeersneed o do soe designdelmena r o ther tender ur s ened togiv so ore ead t
10、meAs pr iscused yeterdyplea rovie the foowngs:SK spry pain inish s a elaementmateral for stone cldnas indicated inpo drwing. Plese provde the spcicaton frtedeerDor finh.Please provide eign itent ite-up fr the cnoy as ncated in pols drawing.Peaseprvie ihiese for he oe hre possileas weaedealig ithoa
11、l cotctrs.For he qulfition f the tendeaincon calletadvise tha e illvie the qualifica of the firm tat theyare wing with in decoursehih I think i ok giet gt ieline(aroline is ths owth y ? pls advie).For desig/drawigs sony folw up asap.Fo contactrovsios nmei pls folou aa.y cpy ofthismail,appect A,M
12、ichee ndCrolinec el rew inparel d vert withor commensif yinparalll.Plee undestndingtat are cllngseveral cntractsn rlel ioder tot te tigh timeline and you ssisae in the ov are apprciatedPerourconall for he it Spy OA coment/oncensus as ollw asnotdbyS int ttached :itm 1.2 order of listing sgst upda
13、e te special conditionsnsdite 3. (3) ainta 5maxperagreet dingtnd clarificatonsiem 3.4 (d) sugges mnd te mnoerrrwnsnng te contractm 36 (3) a as item aboe.other qeies asclifi byQ.s the abve ies have beenclarified,there i no more issuwih thesuply O hich KONE astamedadeturned Sl update on the spcilconit
14、io andinstlationLOA sprtey frdiscsiooncall ap (Jerry pls aret for Fidy ftenoo sa 4p as spken)Pr our oncalfr tit Sup LOA omments/cncnus asfolow a noted by QSnthe atached :ite1. orr of listin sggest uatethe specicondiion instedtem3(3) atan 7% max per agreem durineer rficatiosiem 3.4(d) uggst amend the
15、mior errr whensini th corcit 3.() ame a item 2 oe.thr queries aslarfied byQS.A he ae items haveen caifidter no ore suewth thsppLOA which ONE hadstpdn rerned. Q l pde on he specntiandinstalation LO eparae frdiscusio/oncallaa (rry lstarge Fridy atnoon y pm as spo)A r icusd yesterdayease poide hefo
16、ongs:SKK pray antfinish aeplcemtmaterialortn cddins inicatdi Caolsrawing. lease poithe spficatio for tndeers.Drinih.Plee prvde sin intent wrteup orthe anyas indicatd i apo drwing.lae prdein Chnse fo theabove wrepssible s wear dalngwit ocal contractos.Apeciate if you culd clear t attaccontract. Ill g
17、o thrug at end in prll.Iheo further coments n oth te bond ad avancepayment bod, howevera r aedevitions om th forma gie hebod, pleansuretha leara is otand fromMa LanEdwa and Trac spr SPrequremetsAlsoifth 2bs are not fomth ig bank herepeeobtain clearace fomMay La swellFor update, hae 2main con
18、trat i sgnd by SCGnd thyt t rturn y next Moda. Appreate yourURGENTeview an retyurcmentsf yn he elated perrance odsper atche foQSSCG follow up on acitioncallde thismornng. He metoned tat main con wuld liket deducthe P feesn ter aymt. Canyou plselpo check up thedetais in your recommene pyt cet (ay
19、ment10.2),e o acullyeduce tefes rady nd y ma cnorhow? Thans.l find th attaced foryr leaapls. I had senomy beore sh oes n leaveuthavnotrered to us.Lu,pls hoditntl our clrance folegal. ory for conencecusedJertm371, he uation f subitin th matriai to on. Te wholectract perio is on mon. Plese duc t r
20、asonable im fme. They ar submitin perfoance nd right? Cannot findine LOA ThansI hve no furthr omts on bohhe on and adaneaymnt bond,howverthere are deviions fo te forat ien orthe bnpleaseensurhat clearance is otained from My LanEdwr n Tacyas S reremensAso, ifthe bnsrent fromte big 4 bans eeas
21、eoa clarane from MayLn as ll.Foupdtephas 2man ontrt isbeig signed by CGadth targett etn b net Monay AppreeyrURGT review nd revert your cmens, if anyo e relatdperfrmance bonds ertahedfor QSGfllw up on tvaionF theualificatn of the enerer,Mincncalle oadve ttheyll provde the quaifcation he r th hey
22、r orkin i i duecourswhchI think is o ienthe ightmele (carolne i thk with you ?pl avse)For desgn/drawing sonnyls follo up aapor trct prvsion yan pls fllow p asap.B copy of thi mailapprecatAmyMihellead rline can hlp reiw n prllel and rrt thourcmmetsif anyi palel.Plese dsadin tht eecalig eera
23、l ontrats in arall in orde tomeetthe tight timelne and you assisnc in the above aapprcitd.hae no further commensonoh tebn andvane amntbond,hwever,as e ae deviatns fr te frt givn orth bondplese nure that learanceis obtainefrom May Ln, dwar d Trayas er SOrequients.Alsof the onds ar not f thebig ba
24、s hereplase obtain caance from MaLaas wllor udate,phase 2mai ntrat bein sgne y SCG ndhey targe t eturnbynext Monday. Appreciate your GNT reiewndrevert yoroments,if no the relted perfrmn bon er aachd forSSC fllo up on actiatio.ave nofrher comnts on bth te od and advanceyent bodhowevsth ae dei
25、atis frm th fomat venfo te ond,ese nsurethat lerance i otaiedfrm May LnEdward and Tracyas perSOqurements.loif he 2 bondsre notfrm the b4 nks hrepeebtainclancefro My an as well.For udatephase2 man cnratis eig sged b CG n they target toreturn y ext day. ppecat ur URGET revie andevert you comme
26、nsi any, o t rad perormancbons peatchedforQ/SCG folow up on ivton.Perourncalfor th LifSupplyLOA ommnts/conces as fllo sned by Qin th atach :im .2 orerofistng suggstupdathe pecia condiion intetem 3.(3) mainin 5%ax per agrent duing tender clarfitnit 3. (d)suggesamendthemior ero when sningthe contrat
27、iem 3. () sam a item aoe.ther queries s larified by S.Aste bo items hav e laifiedhere isno oe issue t th supply LOA wi KONE ha stmpedan retrne. QS wll udate on the secial oniionsa istton LA epartey rdscssin/ocll ap (Jerry pltarefr Frday ftenoon sa 4pm spoken)Ecls plase find henoe for the LOA adscu
28、ssed n od n-ca.AsKOE had expesed tir reement to t ameen in the Speilonditins of Conrctwe illgo throgh the tais with KONE nd adie to r Ofic tomorrwPles aise as follows:)We hve se te omt of lawyer(asloed) to ONE. Wavdcsedwith ONEand the rally rese toamedthose reveTrms ad Cnitio Oill prvide writtni f
29、r te sam ater Aprciate fo coldlasewit MT lawyer wetherteyha y opiniont the lealtaningpsiton ofth Contractwithut thpopose andm2) Inespec of te ropoe 5 reteton to b rleasdafter theDefect Libilty Priod in heintlaton conractKN rfusd o is the pymnt emsas taed inteir tender sumssion(50%fter comencementb
30、7 dand 0% pnQC acted y ovenment Dept.) They rter prpsed toiv aretetionod for te purpoe. lease cfir if it is ccetable o yor ffic.3) W ae reced comme(a eclosed) to theSCS ntratWe intnd oforwr t KON fr eview Please avseif othewis.s okjustnow, pese conlidate te otact togthr withe itm greeddurng he endr
31、period.Plase erif on this a upae accoingPreiouso as of uplyLOAtahed te instaltion LOA fr verficationPlaeavise sfolos:1) We hae hcontof M lawr (aselosd) toKNE.We vedcussed with KNE nd hey veraly eue to amnd ths evied Tr and Condtions.KONE wilprve writt ema for the same lerAreciateif cul liaise itMa
32、wyer whether theyave any opiontothe legalstding/psiton of t tract itout thppoed amedment.2) Inrspect of thprpoe5 enton to b reeased terheDefectLabiity Priod in the intalltn cotract, KNE refusd torviete pmn terms as stated intheir tndsubiion (5% after mmnmeby7daysand 50% pon QC ccet by oermnt et). Th
33、ey athr proposd oive aretenton on for he purpose.Plas cnfrm f it isacceptal to your Offe.3) Waereceved SG comen (as enclose) to heNSC b Contract nted ofrrdt KNE fo review.Please dvise if oterwie.As spokn nowplease conolidaethe cnac togethe with te iems gredurin he en prid Pleasvf onthsand pdt ac
34、diglyIhad rel earlier ok wh t proosed rtun date of 3/dc/210As furherclaified ith theendere,tyreqed to submit the enr on 010-2-.Apciat f yu cod avis e xc date foour ease f olow-u.Sory,we ct read t charactrs underthe blowmail s dscssedte tenderer requed r 5 dys eta orherrepart of ederEclosed ease i
35、te note rth LA as discussed intody Con-cl.As ONEhad expresed thir rement o he amnet he Seia oitions Cotractwwilgo thought detils with KNE ad advise to urOffetoorrw.Pleaseadvse afollo:1) Wehasente mmnt f Tlyr(as enclosed) to KON. e hav iscused wih KONE n they veblly refusd t mnd thoe revisedTesnd C
36、ondtin. ONEwill povid witen emil fo th same aer. Appeciate if youcold liaise with MT ayer whehe they ave n opio tthelegl stading/postio o ontrct itho the proposed amnmt.2) espect ofthe poed5% retentiono be relsed fe hDc LiabiiPeriod in theinstalancontractKO fusd orev the payment tems as stated i t
37、heir tnder subission (50% afer comeet by daysnd 50% upn Qaeped byGovernmet Dept.) yrather proposd to give artention bd fr the uroslase onfrmif i is accptbl yur Off.) Wehave rceivedCG comnt (a enclosed) te NSC Su Coract.We intend t ward o KONE or eview. Pleseadvis if otherwi.As soe just noweas cons
38、oliatehe conra ogewih hiesagreed durin th ende erio. lese verify on hisnd upate cordigyAs urth clifiedwit the tnderr,they eqsted to ubmit t tener on 201-13 prcate if o cold ads the xact date four ese fllowu.Sorryw an rea the chrates uner teow emai. Asdicussed, he tnrerrequested for 5 ay exta fo ei
39、r peparaton oftenerFor udte, phase2 main conacieng ine bySCan they targt to etun by tonday. ppreciate your URGEN reew nd revet ourcomntf anyo he reatedperrmance onds per attahd for QS/SCG follo upon acivionAs spen,atced t sged LAfoveriicationPae avise as follow:1) We hve sent he commen ofMT lawy
40、(asencosd) toKON.We hav icsed withKONEn they rallyrefd to men thoereisd es and Cotos. KONE ill povid rtten mai or thesame late. Appeciate if u coldlaisewithMT layer hethr ey heany pin tothe altading/pstin ofheCorct ithout th roposed amedment.) n respect of th popsd5 reeon to be released afr e efct L
41、abilty Perid in e installatn ntact,KNE rfused rvseth paymettermsa sated i thereder submissi (5%fter commeneen by aysa 5% upn QC accepted y Goernen Dept.). y rater propse t gvea retenio bonfr th urpse.Pleasconfirmiit accptlet orOffce3) Wehaerceived S oment (as closd)to theSb Contt We iendoorwar to ON
42、E for review. leseadise fothrwisAsokn jus wpeae onsoate e onrt together ith h ems agd ungte tenerprod. Please erify on this andupdte acorinlyPlasb nored tt theMain Cntracdumet as reeived by CG. SCG requied to ed back haghi ead Ofcefor excution. As advsd y SCGthe arlet dat set to M i next onayNoe
43、d. We wi carr out Contat pining/indi thi aroo nd wi isue to heContrctr at ourearles.Asproureetingmong ai Zong,Li Zongtephen ad ylf steday afternoonth aged desareas fllw:LOAnd date ocontact 12 Augus 2010mmenet date of cntrc21 ugust 2010/11/25As tere ar urerssues, pl fne themaicntrctdocs and rrg f
44、r SCG to pk up fr sinng.Fo ac paymenbondundrsad scg had ubmittd thedaftto theirbknMonay,pls flloup aswel allel.Plspusfr 11 ug2010 s te tarig dat as eras kicoff eeng th D inFsanoffice on the me da.Als sinc t neotatdwas hld in shagai on9Agoth LOA and otrt dateabe aedon 10 agust.Hav spoken to Dahim a
45、n e adisd teywl rert on er eview o the cotract ocuenby orrow or Advnment ngL/scg dis hy hvassed to her ban fo review/prcsingnd th ak may take afew dayto revr.Plaeb advise as flows:The expiy dtoftebakguartee fo he ceanwas 0-6- based on anisrply tday. Te pfomance bon or he Contact s not affected.A
46、s discusse wt ithe cmmnceendate oule 010-21 nseao 01011 and requestd u ostae thsame under te Cntrat.Plase avieor or acto o otherwseWih respect t the tempary owrplssue,Dai hd no adversecomen t state 00VAuner thContac bdonthe ondiion as pr below advcDaruested ouoffic toprviethees erion of ontract Do
47、cumet o their fn ve.e wilfowa the salat tdFurter oourdicussos day, below thwe have poke to Dai(ndLi Ju Je) rarding h folings:PB expry dte o b 3 oths aftethe ompleti da perour legaldviseCntrac comecement at 1 August 2010 ( ased on kickfetng inFoshaand or red, LDI ride te sftoof plig pans on 21 Augu
48、st;and constutonrmit as obtaied on 26 agust) Di will corm hi buthe dentthinkthiswill bean issuie ength alculati Daiagr toiv ter iagrementwithhe masuemn ehod,and in t ontcfirs. epoary supply D onfiredth nolongr n issue. S echnical all issuear clered upPsfolo p to cocludeasap he ocmens for ir snig.Kev
49、in TnFom: KelviTN Boon Aik St:2010年月18日22:48o:Stepn LAO TunHa;LEW YaMi;JeryWongsgz.cmc: Michlle W uing; CarolieTAN M iang; dwaTNGPing Ken;ZHO Yog Chn; Amy AI Mi; HONG Ming Kh; Catyn LIANGXiain; MicaMO;ffn; YUAN Zi Fu;LOH hyhhinaSubect:R:Bak guaraneefoavacpamen + pae 2aincontractOf cor wil asl.From
50、: Stphen LO Tun Ha To:KelvinTAN Boon Ak; LIEWanMe; JrrWodlsg.cm c: Michelle WU Hu Qig; aolin N uiang; Edwrd TNGPing ung; ZHO g Cheg; my Mi;HONGMingim;CatyLIAG Xiaoying; Moica O; uendlshk.om;YN ZiF; OH Shyh,China Set: Thu o1822:09:42010Subjec: R: Bank guatee for advan ethae 2main contaYou h ersnlly h
51、ase up ai fo ite1 bow touicky closete ole hing pls. Ts. Stephrom:Keln TANBonAik T: tephenLung Hn; IEaMe; JrryWogdlsgz.cmJeryWongsz.cmCc: Mihl WU ui Qin; CaroneTA ui iang; Edward AN igKung; ZHOUg hen; Amy I Min; HONGigKhi; athrn LIANG Xaoin; onia M; ufengds ffengdlhk.om; YUAN iFu;LOHShyhChina Sent:
52、 T N 18 21:0:5 21Subjet: E:Bnk granteeforadvan paymet + phae 2main ntract Jerryhave spoke t ai o item 3s folow:Pile lngth calc sie ph2i bsd on p1 tmthe alc mehod shall bbase o ph defition,and itisvr difictfr us to chang he.Daiadvised ey l revisit he cas tmo am ad rvert. Pl case p omrowForttemray
53、 pewehdrovided400ka i , and thyare requeting fo 00va dueto blks. I avexplainedtat aapplid a dediced50kva pwrfor has , an the blance 300kva he quir can ape from phae . Howeerinoder t tcomplicate te oracsforhe 2 phase,e ilmeti50kva nh2 conract. He ha verbl ared ttis.lease ind urrpl or th followins:-
54、We ar dicussingit my o his,wilgt it concudd tomorrow mori.ld. Pleas incorprate ur Finane Dpartent omentsYor tretwas noe Plase beinormed hat thre arestl below isses to follwe up.Bank uaratee s advisd byCG刘俊杰tiseudne week (om tody) fo tebankmmentnthe revisederms in ank garante. Th lidit priod of hbk
55、 urantee is til pnding odvice from MT layer.Contr Trsfr advce pyent Tposd contract tems hs enforarddo MT lawy oroment by nmi n 10111.T terms hav fowarto for emen ftrwd.Pile lngth ccuatindtemprary owr suply Asiscssd witCGiaiBin,h ssueof pie length clcultion issl unresolve andthtempoay oer supply they
56、 requeste for 00VA instead of 500kA a er adce. We willompilth P2 Min Contract cument aedon thavailabl inormatinwthithis wk.Regard,Jrry WongDLSGZ发件人: Ewad ANPng Keung ailo:eward.tgmaletree.con发送时刻: 2010年1月1日16:10收件人: Kelvn AN BoonAik; thL TugHan;Mile WUHui ing; myAIMin;eryWng抄送: CrolineT M iang; IW Y
57、an Mei; OU ong hen;HONGMing him; Cathrn LIANXiaying; Monica MO; fuengdlsh; YUANZ F; H SyCn主题: RE: Bnk gurntoravance pymnt + hase 2 an contratHi Keln and the em,Iwis to taketispotunity emindth ea anthe consultns tht wemus hae the costrucion fo atleas 2 bloscopltd o a stag thatwcn receive thepre-ale
58、pemi by 15March 201ftisct be acivedthe hole tam,incuin conractorconsultn and ourelves llfi. her so ned o pntfger.We simplyall fil t ahevethe taget.I xpect everyone to tke thivry seriosl. I know tme i tght ad e annt afford ny houof ly.Cracormstoe ta plathatthetget can beaievednlding woring4 ous
59、 a d.must mae sur that theyimpeentaccordngto he pln. t hame imeemst cilitate teir woscnrctin drwings mut e readyo hebefrhand. Decsonmus be ade in goo te.Tisisa team fort e cnnot t pusit to h otrao and waand eeKelI pct ou o kethe edersh role.If yu comeaos ay rdle you cannot stleplease medat
60、ely nform e ad will sot toutryu.Pese immedatey workwith tntrctor tsee hw t taetca b me.If we realdont ave engh timewe haveto rktrouhth Chinee Nw Ya wthout ny oppage. his nedst plan ahead ad I epecthwoe team o work throughte Cine New Year with heCotractor.Formewlltay in hn ithou guys durg CNY as
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- SRE 工程师考试试卷及答案
- 冠脉严重钙化病变的规范化处理策略(临床完整版)
- T∕AOPA 0102-2025 无人驾驶航空器中小型机场围界巡查技术规范
- 专题十二:热学 近代物理(原卷版)
- 专题二、力与曲线运动阶段检测卷(培优教师版)
- 贵州省贵阳市、六盘水市、黔南州2026年下学期高三化学试题期末考试试卷含解析
- 社区医疗绿色转诊的效率与健康公平
- 26年多组学检测指导精准用药决策
- 2026届湖北省襄阳、孝感市高三下学期第三次质检考试化学试题含解析
- 2025~2026学年湖南长沙市师大附中双语实验学校七年级下学期英语入学学情自测
- 企业并购的机遇与挑战分析
- 射线检测专业知识考试题库(含答案)
- 2024年全国统一高考数学试卷(理科)甲卷含答案
- 湖北省襄阳市2023-2024学年小升初语文试卷(含答案)
- 黑龙江省建筑工程施工质量验收标准(建筑地面工程)
- 第八课 良师相伴 亦师亦友
- 2023年南京市中考历史试题及答案
- 《公共政策评估》课件
- 350种中药饮片功能主治
- 蓄电池安装施工方案方案
- 健身步道建设项目可行性研究报告
评论
0/150
提交评论