×

注意!页面内容来自https://www.usgbc.org/node/4787904,本站不储存任何内容,为了更好的阅读体验进行在线解析,若有广告出现,请及时反馈。若您觉得侵犯了您的利益,请通知我们进行删除,然后访问 原网页

< type="text/css">p { box-shadow: none !important; } #article-body::selection { color: black; } .article-body--wrapper::selection { color: black; } #block-messagebanner a { font-size: 14px; line-height: 18px; color: white; margin-bottom: 2px; text-decoration: underline; } @media (min-width: 1200px) and (max-width: 1366px) { .subscriptipn-course .view-grid--wrapper .grid-result--wrapper .grid-item { flex: 0 0 23% !important; } } @media (min-width: 1200px) and (max-width: 1366px) { #course-details--wrapper .view-grid--wrapper .grid-result--wrapper .grid-item { flex: 0 0 23% !important; } } #credit-details--wrapper .credit-details--banner{ min-height: 100px !important; background-size: inherit !important; } .usgbcplus b,.usgbcplus strong{ -webkit-font-smoothing: antialiased; } #header-banner a{ background: none !important; color: #1F6779; border: 0; text-decoration: none; } #header-banner a.btn.greenbuild { height: 37px !important; } #header-banner .btn{ background: #1F6779 !important; color: white !important; font-size: 14px !important; line-height: 16px; border-radius: 20px !important; min-width: 100px; } .board-election:hover { background: #26596a !important; color: white !important; } @media (max-width: 600px) { .banner_{ line-height: 1.5 !important; } } .banner_{ line-height: 1.5; }

LEED v4 and LEED v4.1 Registration Close - Registration closes on June 302026at 11:59 PM ETfor most LEED v4 and LEED v4.1 commercial rating systems. View full rating system transition details and updates. Learn more

Requirements
Pilot Credit 88: LEED O+M Starter Kit is a collection of Pilot Credits that BD+C projects can use in the Innovation in Design credit category for early pre‐approval of O+M prerequisitesstreamlining the path into certification in LEED v4 for Operations + Maintenance. Site Management Policy Systems O+M Plan PurchasingWaste and Renovation Policies Green Cleaning Policy and IPM Plan Prerequisites and credits in the O+M rating system are divided between Establishment and Performance requirements. Establishment requirements are physical assets and policies that can be documented and approved onceand do not generally change substantially over time. Performance requirements involve cyclical actions or ongoing tracking during the Performance Period. Many of the Establishment requirements are included in the BD+C rating systems. The O+M Starter Kit consists of the remaining Establishment policy requirements that are not in the BD+C rating systems.
Stipulations:
  1. All versions and adaptations of BD+C rating systems may use the Starter Kit with the following caveats:
    1. Core & Shell projects must provide evidence that the credits have been developed with the participation of the property management team that will be responsible for their implementation.
    2. BD+C v4 projects cannot use the Systems O+M Manual credit because these requirements are already included in those rating systems.
  2. Teams can use any number of these Pilot Creditsin any number of ID credit slots not to exceed the number of Pilot Credits attempted. (All four can be submitted within one ID credit or each can be submitted in a separate ID credit.)
  3. v3 teams may continue to use similarpreviously allowed strategies for ID creditsbut streamlined approval in an eventual O+M certification will only be allowed if these Pilot Credits are used.
[view:embed_resource=page_1=4787909]
Logging out the application..