×

注意!页面内容来自https://baxtel.com/data-center/microsoft-chicago-northlake,本站不储存任何内容,为了更好的阅读体验进行在线解析,若有广告出现,请及时反馈。若您觉得侵犯了您的利益,请通知我们进行删除,然后访问 原网页

Central
This facility information available to Baxtel subscribers. Get access to complete site detailscapacity informationand strategic market intelligence for data centers worldwide. Contact us for access

Latest Podcast
Street Address
Interested in this information? Contact us
Operational
Fully operational facility
Operated by:

Microsoft Chicago Northlake

Year Built: 2009
Lot Size: 15 acres
░░░░░ Contact Us to subscribe to our data service MW
Total Power
░░░░░░░ Login to view SqFt
Gross Colocation Size

The cost to develop the 707,244-square-foot data center was approximately $500 million and is located NorthlakeIllinoisoutside of Chicago.

The Microsoft facility is more than 15 acres located in direct proximity to a city water pumping stationadjacent Interstate and rail lines that provides fiber optic bandwidthand its own on-site electric substation. There are three 66 MVA electrical substations that provide a total of 158 megawatts of utility power.

The facility was built in two phases. Phase1 was 396,695 sqftand phase2 was 310,549 sqft.

Map and Nearby Locations:

This Facility

Sites within 15 miles of Valley Plus
This facility information available to Baxtel subscribers. Get access to complete site detailscapacity informationand strategic market intelligence for data centers worldwide. Contact us for access

Distance Site About
0.40 miles 505 N Railroad Ave - Digital Realty
The Digital Chicago Campus covers 21 acres of land with access to major fiber networks and can support up to 8 MW of IT load at N+1 redundancies.
0.55 miles Aligned Chicago ORD-01
Aligned's ORD-01 data center is a state-of-the-art facility located in NorthlakeILjust outside of downtown Chicago. At full buildAligned’s Chicago campus covers 520,000 sq. ft. and offers ~ 100 MW of critical load.
0.59 miles Aligned ORD-02
Aligned's ORD-02 is a data center located in NorthlakeIL near downtown Chicago. Part of Aligned's 18.5-acre hyperscale campus.
0.89 miles T5: Chicago lll
T5@Chicago III will be build-to-suitwith the company spending more than $500 million to develop a three-story250,000 sq ft facility for multi-tenant or single-tenant operations.
3.01 miles Digital Realty: ORD15
In 2017Digital Realty acquired the former Motorola Headquarters site in Franklin Park and subsequently converted it into a data center.
3.11 miles Digital Realty: ORD13
3.12 miles Digital Realty: Chicago ORD12
3.13 miles Digital Realty: Franklin Park Expansion
Digital Realty acquired two land parcels near their existing Franklin Park campus in separate transactions on July 2025for a total of approximately $18 million.
3.15 miles Digital Realty: ORD14
3.18 miles Tierpoint Chicago West
3.18 miles Digital Chicago Franklin Park Campus on Grand Ave - Digital Realty
Digital Chicago is a master-planned 40-acre campus in the Village of Franklin Park. The campus has 3 existing buildingstotaling 574,994 sqft
4.33 miles Element Critical CH2
Element Critical acquired the site in January 2019 from Sungard. The facility was previously known as SunGard Wood Dale (341).
4.42 miles Element Critical CH1
Element Critical acquired the site in January 2019 from Sungard. The facility was previously known as SunGard Wood Dale (711).
4.48 miles CyrusOne: Wood Dale CHI6
CyrusOne is developing a 62-acre campus in Wood DaleIllinoiswith plans to construct six data center buildings encompassing approximately 1.4 million square feet.
4.66 miles LexusNexis Oak Brook
4.66 miles Verizon: Swift Dr
4.66 miles DataBank (ORD4) Oak Brook
5.28 miles Server Farm Oak Brook
The campus was originally built as the corporate headquarters of the Chicago Bridge & Iron Company (CB&I).
5.29 miles Centersquare: Chicago ORD2
Cyxtera's CH3 Elk Grove site is across the street from the Digital Realty Chicago campus (former Dupont Fabros) and close to Equinix CH3.
5.29 miles US Signal Oakbrook IL01
800a 480V 3 phase 450kW diesel generator with 24 hour run time at full load 500kVa UPS capacity with battery backup
5.29 miles Verizon: (Oak Brook)
5.40 miles NYI Chicago (Oak Brook)
5.43 miles 2299 Busse (CH2) Digital Realty
5.50 miles Rackspace Elk Grove ORD1
5.51 miles Deft: Elk Grove DF-CH1
5.51 miles HostPapa CH1
Formerly known as "ColoCrossing CH1"
5.51 miles Digital Elk Grove Village Campus
Digital Realty Trust's Chicago campus is massive and is split among 3 buildings. The campus was acquired from Dupont Fabros in September 2017.
5.55 miles 1450 E Devon Ave (CH3) DRT
5.56 miles 2200 Busse Rd (CH1) DRT
5.58 miles Lumen Broadview
5.72 miles EdgeConneX CHI01
5.74 miles Stream Chicago II
Stream Data Centers' Chicago II data center in Elk Grove VillageIllinois is a 226,000 square foot facility.
5.74 miles DigiCo: Chicago
The facility sits on a ten-acre site and will serve as a flagship asset in HMC Capital's newly established DigiCo Infrastructure REIT.
5.79 miles EdgeConneX: CHI03
EdgeConneX is constructing a new 167,000-square-foottwo-story data center building on its Elkgrove campus near Chicago.
5.79 miles EdgeConneX CHI02
5.81 miles TA Realty: Elk Grove
TA Realty is constructing a 45-acre data center campus at the corner of Elmhurst Road and Old Higgins Road. The development includes four two-story buildings and an electrical substation.
5.81 miles Equinix: CH5
Equinix has started construction on a new 195,000-square-foottwo-story data center in Elk GroveChicago. This new facility is being built right next to their existing CH3 data center.
5.82 miles Equinix Chicago CH3
5.86 miles Stream Chicago I
Free-StandingData Center Designed to Tier III Standards
6.28 miles West
6.28 miles T5: Chicago V
T5 Data Centers has secured land in Elk Grove Village to build its upcoming CHI V data center. The planned 220,000 square foot (20,438 sqm) facility is expected to be operational by 2028.
6.34 miles STACK Chicago CHI01
6.38 miles NTT: 1200 N Arlington Heights
NTT has acquired two office buildings in ChicagoIllinoisand plans to replace them with data centers.
6.40 miles STACK CHI01B
STACK INFRASTRUCTURE CHI01B Chicago Data Center is located at 1441 Touhy AvenueElk Grove VillageILwhich currently offers 24 MW of critical power and 221,000 square feet of space.
6.42 miles NTT: CH3
This facility is a part of NTT's Chicago data center campus in Illinois.
6.43 miles NTT: 1250 N Arlington Heights
In November 2023NTT Global Data Centers in November paid $27.5 million for the building.
6.45 miles NTT Chicago CH1
NTT acquired its Chicago site in 2018 through its RagingWire subsidiary. Launched in 2021the first two-story data centerCH1spans 126,000 sq ft (11,705 sqm) of data floor space.
6.45 miles Iron Mountain Chicago
First announced in 2018the former Hart Schaffner Marx suit factory started construction in 2024.
6.49 miles Stream: Chicago III DC3
Stream DC aims to demolish around 55 Elk Grove residential properties to develop a three-building data center campus with an on-site substation. The three buildings will total more than 2 million sq ft.
6.50 miles NTT: CH2
This facility is a part of NTT's Chicago data center campus in Illinois.
6.56 miles Stream: Chicago III DC2
Stream DC aims to demolish around 55 Elk Grove residential properties to develop a three-building data center campus with an on-site substation. The three buildings will total more than 2 million sq ft.
6.68 miles Stream: Chicago III
Stream DC aims to demolish around 55 Elk Grove residential properties to develop a three-building data center campus with an on-site substation. The three buildings will total more than 2 million sq ft.
6.69 miles Stack: CHI02
Data center firm Stack Infrastructure is expanding its footprint in ChicagoIllinois with a new data center in Elk Grove Villageknown as CHI02.
6.79 miles 360TCS-Lombard
6.79 miles Digital Fortress: Chicago Lombard
7.35 miles Prime Elk Grove
Prime Data Centers is building a 750,000 square foot hyperscale data center campus in Elk Grove Village (Chicago)Illinoiswhich will comprise an investment of around $1 billion.
7.40 miles Prime: ORD01-02
Building B will be another three-story constructionoffering 279,360 gross square feet of space.
7.43 miles Prime: ORD01-03
Building C will be another three-story constructionoffering 294,429 gross square feet of space.
7.55 miles CyrusOne: Lombard CHI5
9 MW of critical capacity Both a 1.5MW and a 2MW transformer
7.55 miles Station Two
The 37-acre plot in the Elk Grove Technology Park could eventually hold three data center buildings totaling 400,000 sq ft (37,000 sq m).
7.59 miles T5 Chicago II
T5 Chicago II campus is located at 200 Innovation Drive in the Elk Grove area.
7.60 miles Plaza
The 36.6-acre plot in the Elk Grove Technology Park could eventually hold three data center buildings totaling 400,000 sq ft (37,000 sq m).
7.69 miles North
The 36.6-acre plot in the Elk Grove Technology Park could eventually hold three data center buildings totaling 400,000 sq ft (37,000 sq m).
7.79 miles CenturyLink: Arlington Heights
8.00 miles CloudHQ: Mount Prospect ORD2
CloudHQ is building a $2.5 billion data center campus at the former United Airlines world headquarters office campus in Mount ProspectIllinois.
8.00 miles Equinix Chicago CH7
8.07 miles CloudHQ: Mount Prospect ORD1
CloudHQ is building a $2.5 billion data center campus at the former United Airlines world headquarters office campus in Mount ProspectIllinois.
8.13 miles CloudHQ Mount Prospect ORD3
CloudHQ is building a $2.5 billion data center campus at the former United Airlines world headquarters office campus in Mount ProspectIllinois.
8.42 miles Aligned: ORD-04
This facility will be part of Aligned's ORD-03 campus in Elk Grove Villagea suburb of Chicago.
8.44 miles Nexstar: Elk Grove Bldg 3
8.45 miles Aligned: ORD-03
Aligned is building a datacenter campus after acquiring an assemblage of beleaguered office properties near O’Hare International Airport.
8.52 miles Nexstar: Elk Grove Bldg 2
8.62 miles Nexstar: Elk Grove
TV and radio company Nexstar Media Groupowner of the 50,000-watt AM stationplans to develop a data center campus on 35 acres on the south end of the transmitter site in partnership with an unidentified developer.
10.10 miles Connect Data Centers: Chicago
Oppidan is developing Carol Stream’s first data center in ChicagoIllinois.
10.77 miles DataBank ORD3 Mount Prospect
10.77 miles Colocation America CH3
10.86 miles Apotech: Illinois 1
Apotech Group operates its Illiois 1 data center facility in the Chicago marketsituated at 1331 E Business Center Drive. This facility is a retrofitted structureencompassing 32,000 square feet of space.
12.09 miles Complete Source Schaumburg
12.21 miles Centersquare: Lisle CHI1
Centersquare's cloud-enabled Lisle data center is situated approximately 20 miles from O’Hare International airport.
12.84 miles Karis: NapervilleIL
Karis Critical initially proposed two 211,000 sq ft buildings on the 40-acre former Alcatel-Lucent campus but has scaled back the project to one building.
13.19 miles Metro Edge: Illinois Medical District (IMD)
Commercial real estate investment firm Metro Edge Development is building a data center in ChicagoIllinois.
13.93 miles QTS: Chicago 3
QTS plans to build another data center building on its Chicago Campus.
14.02 miles QTS: Chicago 2
QTS is developing 366,000 sq ft (34,000 sqm) of data center space across three storiesalongside 80,000 sq ft (7,432 sqm) of office and loading areas in its Chicago Campus.
14.05 miles QTS: Chicago Campus
The campus was a former Sun Times Press Facility and was acquired in 2014
14.14 miles Cogent Naperville
14.21 miles Lumen Chicago 2
14.28 miles Lumen Chicago 4
14.61 miles TierPoint Chicago Polk
14.62 miles EXA - 111 North Canal
Former GTT suite
14.62 miles Lumen Chicago 1
14.63 miles First Communications Chicago
14.78 miles DataBank (ORD2) 840 S Canal
14.78 miles Server Farm Realty 840 South Canal
4 MW Critical Load on Each Floor (Floors 1-5) 130-160 Watts per Raised Floor SF
14.78 miles Lumen Chicago 6
14.88 miles CoreSite Chicago CH2
In February 2018CoreSite acquired a two-acre land parcel in downtown ChicagoIllinoison which CoreSite built CH2a greenfield development of a 175,000-square-footturn-keyfour-story data center supporting 18 critical megawatts of power capacity. The building was completed in June 2020.
14.91 miles Lumen Chicago 3
14.95 miles Cogent: 216 W Jackson
15.09 miles Netrality Chicago: 717 S Wells
The 10 story building was constructed in 1923 and eventually was converted into a data center.
15.09 miles Legacy: Chicago Byte Exchange CBE1
An affiliate of real estate firm Prime Group bought an office building in Chicago from options exchange company Cboe Global Markets for $12 million.
15.09 miles Crown Castle 725 S Wells
15.09 miles 725 S Wells - 1547 Critical Systems
In 2025a joint venture formed by Harrison Street Real Estate CapitalLLC and fifteenfortyseven Critical Systems Realty (“1547”) acquired this data center from CIM Group.
15.13 miles QuadraNet Chicago
15.13 miles Cogent: 427 S LaSalle
15.13 miles 365 Chicago
The site is a former Switch and Data site (also owned by Equinix for a short period.)
15.13 miles CoreSite Chicago CH1
Once owned by the Western Union companythe building was formerly known as "The Telegraph Building."
15.17 miles Verizon: 140 S Dearborn
15.23 miles Lumen Chicago 5
15.23 miles Cogent: 600 S Federal
15.23 miles Colocation America CH2
15.23 miles Digital Realty: Chicago ORD11
15.32 miles One
Microsoft Hoffman Estates data center campus is located on a 53-acre site on the north side of Lakewood Boulevard.
15.49 miles Plaza Alpha
Microsoft Hoffman Estates data center campus is located on a 53-acre site on the north side of Lakewood Boulevard.
15.50 miles Core Station
Microsoft has expanded its presence in ChicagoIllinoisacquiring 30 acres of land in the Hoffman Estates area for $41.5 million in March 2023.
15.56 miles Park One
Microsoft has expanded its presence in ChicagoIllinoisacquiring 30 acres of land in the Hoffman Estates area for $41.5 million in March 2023.
16.12 miles NetSource Chicago
16.16 miles Centersquare: Chicago ORD1(BC & D)
Digital Realty Trust owns the building at 350 Cermak and is CTL's Landlord.
16.16 miles Centersquare: Chicago ORD1
Centersquare's ORD1 site is located in the heart of the Chicago Financial District on the 7th floor of an 8-story building on a fiber-linked campus.
16.16 miles Steadfast Chicago 350 E Cermak
16.16 miles Colocation America CH1
16.16 miles Equinix Chicago CH1CH2& CH4
Equinix distinctly separates CH1CH2and CH4 into separate data centersbut in realitythe sites are in the same building.
16.16 miles Digital Realty: ORD10
Digital Realty acquired the colocation services business of Hivelocity in 2025.
16.17 miles Deft: Downtown CH1
16.85 miles Summit: Naperville
17.25 miles SBA Edge: 603 Discovery
Former New Continuum site that was acquired in 2019
17.53 miles 1547 Chicago Midway Technology Centre
In 2025a joint venture formed by Harrison Street Real Estate CapitalLLC and fifteenfortyseven Critical Systems Realty (“1547”) acquired this data center from CIM Group.
17.73 miles Karis: Hoffman Estates Campus
Karis Critical purchased 180 acres of land in the Hoffman Estates area from 5a7 for $45 million.
17.86 miles Karis: Hoffman 2
This planned facility would be part of Karis Critical's Hoffman Estates Campus in ChicagoIllinois.
18.33 miles Edged Energy: AuroraChicago
The new data center campusAurora TechParkwill offer facilities built to handle dense AI-driven workloads that are transforming the IT industry.
18.47 miles 4267 Meridian Pkwy: Lincoln Rackhouse
The facility was acquired when Lincoln Rackhouse acquired Bytegrid in 2019.
18.47 miles DataBridge: AuroraIL
DataBridge Sites is the new name for ESite Systemsa company with two decades of history in the industry.
18.50 miles Edged Energy: Chicago ORD03
This facility will be part of Edged Energy's Aurora TechPark in Chicago.
18.50 miles Edged Energy: Chicago ORD02
The new data center campusAurora TechParkwill offer facilities built to handle dense AI-driven workloads that are transforming the IT industry.
18.51 miles North Station
HPC and cryptomine data center developer Hut 8 is developing a 120,000 sq ft (11,148 sqm) data center nearby BataviaKane County.
18.71 miles CyrusOne: Aurora III (CHI3)
CyrusOne is developing a pair of new data centers in AuroraIllinoisa project that will also include the construction of three 350-foot telecommunication towers.
18.75 miles CyrusOne Chicago Aurora CME
In 2016CyrusOne acquired the CME data center for $130 million. CME hosts its electronic trading platform CME Globex on site. Globex will continue to be hosted on site as part of the 15-year lease agreement between CyrusOne and CME.
18.77 miles DataCanopy: ChicagoIL
18.80 miles CyrusOne: Aurora CHI2
The CyrusOne CHI2 data center is located on 16 acres45 minutes southwest of Chicago O'Hare International Airport.
18.82 miles CyrusOne: CHI3 DC2
CyrusOne is developing a pair of new data centers in AuroraIllinoisa project that will also include the construction of three 350-foot telecommunication towers.
18.85 miles Compass Hoffman Estates
Located in Cook Countythe campus will feature five buildings and represents a total planned investment of $10 billion.
18.97 miles CyrusOne: CHI2 DC2
CyrusOne's CHI2 second building is located at 2805 Diehl RoadAuroraIL.

East Ridge
This facility information available to Baxtel subscribers. Get access to complete site detailscapacity informationand strategic market intelligence for data centers worldwide. Contact us for access
Data Center Photos (See all)

Container Canyon" area
Source: Baxtel
Northlake substation on campus
Source: Baxtel
Gens stacked up
Source: MH Architects
Cooling Towers
Source: MH Architects
State of Azure Locations as of July 2019
Source: Microsoft
Conceptual Azure Regions and Availability Zones diagram
Source: Microsoft

Operating Company

Operated by:

Microsoft uses Containers (called ITPACs) to build out its data centers. These Containers are Shipping Containers fitted with all the necessary climate controlnetworkingserver racks and other hardware necessary to be a “mini” data center all in one.

Azure Regions

An Azure region is a set of data centers deployed within a latency-defined perimeter and connected through a dedicated regional low-latency network.

With more global regions than any other cloud providerAzure gives customers the flexibility to deploy applications where they need to. Azure is generally available in 46 regions around the worldwith plans announced for 8 additional regions.

Geographies

An Azure geography is a discrete markettypically containing two or more regionsthat preserves data residency and compliance boundaries.

Geographies allow customers with specific data-residency and compliance needs to keep their data and applications close. Geographies are fault-tolerant to withstand complete region failure through their connection to our dedicated high-capacity networking infrastructure.

Availability Zones

Availability Zones are physically separate locations within an Azure region. Each Availability Zone is made up of one or more data centers equipped with independent powercoolingand networking.

Availability Zones allow customers to run mission-critical applications with high availability and low-latency replication.

302
Facilities
63
Markets

Similar Sites

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?