注意!页面内容来自https://www.cbp.gov/border-security/along-us-borders/smart-wall-map,本站不储存任何内容,为了更好的阅读体验进行在线解析,若有广告出现,请及时反馈。若您觉得侵犯了您的利益,请通知我们进行删除,然后访问 原网页

Skip to main content

An official website of the United States government

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

Secure .gov websites use HTTPS
A lock ( ) or https:// means you’ve safely connected to the .gov website. Share sensitive information only on officialsecure websites.

Smart Wall Map

< type="text/css">.embed-container {position: relative; padding-bottom: 67%; height: 0; max-width: 100%;} .embed-container iframe.embed-container object.embed-container iframe{position: absolute; top: 0; left: 0; width: 100%; height: 100%;} small{position: absolute; z-index: 40; bottom: 0; margin-bottom: -15px;}

U.S. Customs and Border Protection’s “Smart Wall Map” is an interactive map designed to depict the status of border barriers along the 1,954-mile border between the U.S. and Mexico. CBP is utilizing funds from the “One Big Beautiful Bill Act (H.R. 1)” to construct a border barrier systemor a “Smart Wall”which includes a combination of primary and secondary steel bollard wallwaterborne barrierspatrol roadsand the technology required to tie it all togethersuch as cameraslightsand other detection technology. CBP’s Smart Wall Map provides details on the status and locations of border barrier along the Southwest border to include barriers constructed prior to January 202025in addition to where new Smart Wall is being planned for constructionalready under construction or has been completed since January 202025. This information will be updated weekly as construction progresses.


Visit the Smart Wall FAQs page

Click and zoom on the map to see more information about the Smart Wall

 


CBP is using the following to define the Smart Wall status:

  • Planned — Represents the total mileage planned/funded for construction but the contracts have not yet been awarded.
  • Awarded — Represents contracts that have been awardedand the project is in the design phase or early construction activities have begun.
  • Under Construction — Represents projects where border wall panels or waterborne barrier is currently being constructed/deployed.
  • Completed — Represents the total mileage that has been completed since 1/20/2025.

U.S. - Mexico Border - 1,954 miles

Existing Primary Wall (prior to 1/20/2025 that met U.S. Border Patrol operational requirements): ~644 miles Primary Wall & ~75 miles of Secondary Wall

Barrier TypeExecuting AgencyPlanned (not yet awarded)Awarded (Design Phase)Under ConstructionCompletedTotalEnd State
Primary Smart Wall (New)CBP19353.1226.430.26291,419 miles*
Department of War--3.52.56
Primary Smart Wall (Replacement)CBP633.845.512.2125
Department of War---15.215
Waterborne Barrier SystemCBP0408116.411.0536536 miles
Secondary Border WallCBP242185.6186.218.9632708 miles

* Approximately 535 miles of the U.S. - Mexico border without barrier will be covered by detection technology due to unfavorable terrain or remoteness of location.

CBP is also deploying approximately 549 miles of technology in locations with previously constructed barrier.

The mileages aboveincluding locations on the mapmay vary due to rounding and may change slightly as the projects are finalized and contracts are awarded.